The list of roadworks taking place throughout Redcar & Cleveland for the week ending 7 June 2020


A66/A171 Cargo Fleet Junction Improvements

This major scheme comprises the introduction of a 'throughabout' – a signalised roundabout with two lanes of traffic in each direction running through the middle of it – at the A66/A171 Cargo Fleet Lane junction, together with the introduction of a signal-controlled crossroads at the junction of Cargo Fleet Lane and South Bank Road.


Works will commence on Monday 21st October 2019, and are programmed for completion in late Spring 2020. The section of Cargo Fleet Lane between the A66 and South Bank Road will be closed from Monday 21st October onwards, with traffic diverted via South Bank Road and Middlesbrough Road. A secondary diversion via A1085 Longlands Road and the A172 Longlands Spur Road will also be signed to cater for traffic movements between Cargo Fleet Lane and the A66 (west).


Two lanes will be maintained in each direction on the A66 between 7 am and 7 pm Monday to Saturday inclusive throughout the works period, with a temporary 30 mph speed limit in operation to ensure the safety of road users and site operatives. Vehicular access to surrounding properties will be maintained at all times, as will pedestrian access to Cambridge Road from South Bank Road.


Every effort will be made to minimise disruption to the travelling public whilst works are underway. However, given the scale of the scheme and the high volume of traffic that uses the two junctions on a daily basis, delays on the surrounding road network are inevitable, particularly during the first few days after the start of works as drivers adjust their travel patterns. Drivers should, therefore, allow additional time for their journey, and are asked to exercise caution when passing the works area. Enquiries: 01642 245432) 


Church Lane, Ormesby

Two-way temporary traffic signals will be in operation on 18th March 2020, for up to 8 weeks for culvert works. Works to be carried out by Esh Construction on behalf of the Environment Agency (In case of signals failure: 01914923296)

 

West Road / Loftus Bank, Loftus

Two-way temporary traffic signals will be in operation on 27th April 2020, for up to 6 weeks for cable overlaying. Works to be carried out by O'Connor Utilities on behalf of Northern Powergrid (In case of signals failure: 07739642265)

High Street /Ings Lane / Kilton Lane, Brotton

A temporary road closure with Multi-way temporary traffic signals will be in operation on 4th May 2020, for up to 6 weeks to excavate 7m and reconstruct manhole chamber. Works to be carried out by Northumbrian Water (In case of signals failure: 0191 4923296)

Redcar Road / The Wynd / High Street, Marske

A temporary inner lane closure will be in operation on the roundabout on 18th May 2020, for up to 3 weeks to abandon and replace main. Works to be carried out by Northern Gas Networks (Enquiries 07950782188)

 

Flatts Lane, Normanby

Two-way temporary traffic signals will be in operation on 18th May 2020, for up to 10 weeks to install new infrastructure. Works to be carried out by Northern Gas Networks (In case of signals failure: 0732026802)

 

Drake Close / Howard Drive / Mordales Drive, Marske

Multi-way temporary traffic signals will be in operation on 26th May 2020, for up to 3 weeks to replace gas mains. Works to be carried out by Northern Gas Networks (In case of signals failure: 01642 608573)

 

Bydales Drive, Marske

Two-way temporary traffic signals will be in operation on 26th May 2020, for up to 3 weeks to replace gas mains. Works to be carried out by Northern Gas Networks (In case of signals failure: 01642 608573)

 

Kirkleatham Lane, Redcar

Two-way temporary traffic signals will be in operation on 1st June 2020, for up to 1 day to replace bollards. Works to be carried out by Bouygues (In case of signals failure: 07974362101)

 

Ryelands Park, Easington

Two-way temporary traffic signals will be in operation on 2nd June 2020, for up to 2 days to replace manhole cover and frame. Works to be carried out by Northumbrian Water (In case of signals failure: 0191 4145178)

 

Whitby Road, Easington

Two-way temporary traffic signals will be in operation on 4th June 2020, for up to 1 day to replacing street light column. Works to be carried out by Bouygues (In case of signals failure: 07974362101)

 

A173 Newton under Roseberry to Borough Boundary, Newton under Roseberry​

Two-way temporary traffic signals will be in operation on 4th June 2020, for up to 1 day for Inspection of road over rail bridge. Works to be carried out by Network Rail (In case of signals failure: 01912246500/ 07515619322)


NOTE: The information supplied is provisional and may be subject to change.

Should you require any further information on the above roadworks please contact David Slater on (01287) 612579 during office hours. Outside of office hours, please contact 01642 774774.


Contact

Redcar & Cleveland House,
Kirkleatham Street, Redcar,
Yorkshire TS10 1RT

you could call our Customer Services Team on 01642 774774 between 9am to 5pm Monday to Friday.

contactus@redcar-cleveland.gov.uk

Live Chat Software by Click4Assistance UK

Related Documents

Related Links